HOME (Assessment Report)
Land Acquisition
Tract 1 (North) 2003-2005
Tract 2 (South) 2005-2007
Environmental
Phase I
Tract 1 2003 | 2009
Tract 2 2005 | 2009
Phase II
Tract 1 2003
Tract 2 2009
Geotechnical
Tract 1 2003
Tract 2 2005 | 2009
Wetland Delineation
Tract 1 2003 | 2008
Tract 2 2008
Archeological
Tract 1 2003 | 2009
Tract 2 2005 | 2009
Endangered Species
Tract 1 2003 | 2009
Tract 2 2009
Environmental Permitting 2010
UTILITIES
Electric Service
JPEC 2010
W. KY RECC 2010
Natural Gas 2010
Water Service
Hickory Water District 2010
Existing Well 2007
On-Site Water
Treatment Plant 2010
Wastewater Service
Mayfield Elec. &
Water Systems 2010
New On-Site Facility 2010
Transportation
Roadways 2010
Air Service 2009
River Ports 2009
Rail Service 2010

TRANSPORTATION: CONSTRUCTION

ROADWAYS:

The park has direct access to U.S. Highway 45 (4 lane controlled access highway). Other Roadways serving the park are KY Highway 849 (2 lane rural secondary highway), KY Highway 1241 (2 lane rural secondary highway) and the following county roads – Leon Baldree Road, Pittman Road, Whittemore Road, McGee Road, Olden Road, and Old Plant Road.

Proposed roadway improvements will include the construction of a new Directional Interchange (Trumpet Interchange) on U.S. Highway 45 that will be the park’s main entrance.

Time & Cost Estimates:

  • “Trumpet Interchange” - $3.75 million and would require approximately
  • 24 months to complete. (6 months design & permitting and an additional 18 months
    for construction)
  • At present it appears that the two State highways will remain unchanged and some of the
    interior county roadways will likely be closed as the park develops.
  • Final construction is dependent upon tenant’s specifications.

Existing Roadways