HOME (Assessment Report)
Land Acquisition
Tract 1 (North) 2003-2005
Tract 2 (South) 2005-2007
Environmental
Phase I
Tract 1 2003 | 2009
Tract 2 2005 | 2009
Phase II
Tract 1 2003
Tract 2 2009
Geotechnical
Tract 1 2003
Tract 2 2005 | 2009
Wetland Delineation
Tract 1 2003 | 2008
Tract 2 2008
Archeological
Tract 1 2003 | 2009
Tract 2 2005 | 2009
Endangered Species
Tract 1 2003 | 2009
Tract 2 2009
Environmental Permitting 2010
UTILITIES
Electric Service
JPEC 2010
W. KY RECC 2010
Natural Gas 2010
Water Service
Hickory Water District 2010
Existing Well 2007
On-Site Water
Treatment Plant 2010
Wastewater Service
Mayfield Elec. &
Water Systems 2010
New On-Site Facility 2010
Transportation
Roadways 2010
Air Service 2009
River Ports 2009
Rail Service 2010

PRELIMINARY GEOTECHNICAL ASSESSMENT: COMPLETE

Tract 2 (South Section) -

A preliminary investigation was conducted by Geotech Engineering & Testing, Inc. in the spring of 2009 of selected areas of Tract 2 (South Section). Fifteen (15) randomly selected test borings were advanced during this investigation. Additional geotechnical investigations may be required for specific development in designated areas.

Bore Hole Locations Map

Soil Map